By 26 May 1944 all plans and preparations were completed for the Division
to carry out the mission assigned it by First United States Army. Field
and administrative orders had been published and distributed. In a series
of map maneuvres on a special 1/5,000 map regimental and battalion commanders
had outlined their plans in order that all commanders might be briefed thoroughly
on the prospective Division operations. Divisional seaborne echelons already
had departed for the marshalling yards and were assembled in camps scattered
along the Welsh and southern English coasts. The Division mission was to
be as follows:
"Land by parachute and glider before and after dawn of D-Day
west of ST. SAUVEUR LE VICOMTE: seize, clear and secure the general
area ST. JACQUES DE NEHOU (136985) - BESNEVILLE (137928) (both inclusive)
- ST. SAUVEUR LE VICOMTE (exclusive) - BLANDAMOUR (167982) (Inclusive),
and reorganize; seize and destroy the crossings of the PRAIRIES MARECAGEUSES
north of LA SANGSURIERE (188898), at ST. SAUVEUR DE PIERRE PONT (145890);
destroy the crossings of the OLLONONDE River in the vicinity of ST.
LO D'OURVILLE (090894) and block crossroads vicinity LE CHEMIN (102902);
prevent enemy forces moving north between ST. LO D'OURVILLE and junction
of DOUVE River with PRAIRIE MARECAGEUSES (228921); and protect the
south flank of VII Corps north of the same line." |
The mission, however, was changed by the First Army Commander on 26 May
due to confirmed intelligence reports the enemy had strengthened his forces
on the COTENIN, (CHERBOURG) Peninsula with the addition of the 91st Infantry
Division in the general area of ST. SAUVEUR LE VICOMTE. The revised mission
of the 82d Airborne Division was to be:
"Land by parachute and glider before and after dawn of D-Day
astride the MERDERET River, seize, clear and secure the general area:
CR (261938) - CR (265958) - CR (269975) - RJ (274982) - RJ (283992)
- Bridge (308987) - NEUVILLE AU PLAIN (340985) - BANDIENVILLE (360987)
within its zone; capture ST. MERE EGLISE (349965); seize and secure
the crossings of the MERDERET River at (315957) and (321930), and
a bridgehead covering them, with MLR along the general line: CR (261938)
- CR (265953) - CR (269975) - RJ (274982) - RJ (283992); seize and
destroy the crossing of the DOUVE River at BEUZEVILLE LA BASTILLE
(309911) and ETIENVILLE (also known as PONT L'ABBE) (269927); protect
the northwest flank of VII Corps within the Division zone; and be
prepared to advance west on Corps order to the line of the DOUVE north
of its junction with the PRAIRIES MARECAGEUSES." |
New orders and other administrative details made necessary by the new mission
were worked out quickly and disseminated within four days. The change did
not effect the basic plan for movement in three echelons which had been
worked out as follows:
Force "A" - commanded by Brigadier General
JAMES M. GAVIN, assistant Division Commander, to be committed by parachute
before dawn of D-Day and to include.
|
Planes
|
Det Hq & Hq Co, 82d Abn Div |
4
|
Pathfinders |
9
|
Det Hq 82d Div Arty |
2
|
Det 82d Abn Sig Co |
3
|
Det 456 Prcht FA Bn (atchd 505 Prcht Inf) |
|
Air Support Party (atchd Hq 82d Abn Div) |
|
505 Prcht Inf |
117
|
507 Prcht Inf |
117
|
508 Prcht Inf |
117
|
Co B, 307 Abn Engr Bn |
9
|
Naval Shore Fire Control Party (atchd 505 Prcht
Inf) |
|
TOTAL
|
378
|
|
Force "B" - Commanded by Major General
MATTHEW B. RIDGWAY, Division Commander, to be committed by glider
before and after dawn of D-Day and to include.
|
Gliders
|
Hq & Hq Co 82 Abn Div (-) |
22
|
Hq & Hq Btry, 82d Abn Div Arty (-) |
11
|
82d Abv Sig Co (-) |
13
|
325 Gli Inf |
172
|
319 Gli FA Bn |
40
|
320 Gli FA Bn |
54
|
Btrys A, B & C, 80 Abn AA Bn (AT) |
57
|
Co A, 307 Abn Engr Bn |
10
|
307 Abn Med Co (-) |
20
|
82d Abn Rcn Plat (-) |
13
|
Air Support Party |
4
|
Command vehicles - Prcht Regts |
12
|
TOTAL
|
428
|
|
Force "C" - Commanded by Brigadier General
GEORGE P. HOWELL, Commanding General of 2d Airborne Infantry Brigade
to be committed by sea, to land between D plus 2 and D plus 7 and
to include.
456 FA Bn (-) |
87 Armd FA Bn, atchd |
80 Abn AA Bn (-) |
899 TD Bn, atchd |
307 Abn Engr Bn (-) |
Tr B, 4 Cav Sqnd, atchd |
782 Abn Ord Maint Co |
Co C, 746 Tk En (M), atchd |
407 Abn QM Co |
3809 QM Trk Co, atchd |
82 Abn MP Plat |
3810 QM Trk Co, atchd |
Corps Med Dets |
1st Plat, 603 QM (GR) Co, atchd |
Seaborne elements of units in Forces
"A" and "B"
|
Under the plan Force "A" in its entirety was to approach the
CHERBOURG (COTENTIN) Peninsula from the west and to drop between 0100
and 0315 hours on the night of D-1/D-Day on three drop zones. The 505th
Parachute Infantry Regiment and its attachments were to land east of the
MERDERET River about 1,000 yards northwest of STE. MERE EGLISE (3397).
The 507th Parachute Infantry Regiment was to land west of the MERDERET
River about 1,000 yards north of AMFREVILLE (3098). The 508th Parachute
Infantry Regiment and Force "A" Headquarters were to land west
of the MERDERET River about 1,000 yards north of PICAUVILLE (2995).
Fifty-two gliders of Force "B" were to approach the CHERBOURG
Peninsula from the west prior to H-Hour and land on the 505th drop zone.
The remainder of Force "B" was to approach the peninsula from
the east and was to land late on D-Day and early on D plus one on landing
zones astride the STE. MERE EGLISE - BLOSVILLE Road (3694). In a last-minute
change of plan General RIDGEWAY parachuted with Force "A".
Aerial resupply missions were scheduled automatically for the morning
of
D plus one and on call thereafter if needed. The automatic mission was
the
only parachute mission ultimately flown but a small amount of equipment
and sup-
plies were received later by glider.
All airborne elements of the Division had closed and were sealed in
special camps at the take-off fields by 24 hours before the scheduled
take-off time. Parachute elements were located at seven airfields in the
GRANTHAM - COTTESMORE - LANGAR area of the British Midlands, and glider
elements were at seven airfields in the ALDERMASTON - RAMSBURY - MERRYFIELD
area. (See Annex No. 3A)
All men were briefed thoroughly on their missions, a recheck was made
of
all equipment and personnel, and planes and gliders were loaded with equipment.
The Allied D-Day was postponed 24 hours because of weather conditions,
and the
first planes of Force "A" took off at 052315 June 1944.
The main flight was preceded by the three regimental pathfinder teams
which
dropped one-half hour prior to the first group. The pathfinders sustained
many
casualties and had difficulty in using lights, but they accomplished their
mis-
sion and set up beacons to guide the incoming planes to the three designated
drop zones.
The flight over the English Channel was in good formation and without
in- cident, but between the west coast and the drop zones a heavy fog
bank tended to break up the formation of the planes. Flak and some enemy
night fighters activity caused some of the troop carrier planes to take
up evasive action, and by the time the drop zones were reached many planes
were scattered, and were flying at excessive speeds and at altitudes higher
then those ideal for jumping.
The 505th Parachute Infantry Regiment landed generally in the vicinity
of its drop zone. The 507th Parachute Infantry was scattered, one element
dropping in the vicinity of MONTEBOURG, another south of CARENTAN and
the reminder astride the MERDERET River east of the drop zone. The 508th
Parachute Infantry Regiment was likewise scattered widely, the bulk of
its parachutists dropping east of the Drop Zone and some personnel landing
as far away as nine kilometres south of CHERBOURG.
The 52 gliders containing batteries of the 80th Airborne Antiaircraft
Battalion and detachments and forward parties of artillery, signel and
Division Headquarters groups followed the main body of paratroopers and
began landing at 0404 hours. The gliders also encountered fog and flak.
They too were scattered, and many of them were damaged upon crashing into
the small fields and high hedgerows.
Enemy reaction to the landing of the 82d Airborne Division in the NORMANDY
area was prompt and severe, but from the time the first member landed
until 35 days later, when the Division was finally relieved, every mission
was accomplished and no ground gained was ever relinquished.
A day-by-day account of the Division activities follows:
D-DAY, 6 JUNE 1944 (See Annexes 5 and 6)
The first element of the main body of the Division jumped at 0151 hours,
having been preceded 30 minutes by Pathfinder teams. By 0312 hours all
paratroopers had landed, and at 0404 hours the first of 52 gliders in
the initial glider serial crash landed. Both parachutists and gliders
were scattered.
Small groups and some units attacked to secure the Division zone. Groups
of men and individuals who had been scattered in the landings rejoined
their
units throughout the day, and by nightfall approximately 30 per cent of
the
Division's forces were under control.
At 2100 hours 100 gliders landed with artillery, engineers, and special
troops. Seaborne elements set sail at 0645 from BRISTOL except for a task
force consisting of Company C, 746th Tank Battalion; the 1st Platoon,
Troop B, 4th Cavalry Squadron; and elements company F, 3d Battalion (originally
2d Battalion, 401st Glider Infantry), 325th Glider Infantry. This task
force landed on Utah Red Beach at 1400 hours and proceeded inland with
the mission of contacting the Division near STE. MERE EGLISE.
At the close of the day, the Division was in the midst of severe fighting.
It had captured STE. MERE EGLISE and held a general line along the MERDERET
River
from LA FIERE (319963) south to include the eastern end of the causeway
over the
MERDERET River at 321930.
Headquarters & Headquarters Company, 82d Airborne Division
Parachute elements, part of Force "A", dropped at 0214 hours
near the west bank of the MERDERET River, and glider elements, leading
echelon if Force "B", landed at 0204 hours. The Force "A"
Command Post was set up initially at 305965, west of the MERDERET River,
but at 0730 the group waded across the River to the east bank and assembled
at LA FIERE (319963). A new Force "A" Command Post was established
at a railroad crossing at 326944.
The Division Commander, who jumped with the 505th Parachute Infantry,
estab- lished his Command Post in a hedgerow west of STE. MERE EGLISE
at 332965. Elements of Headquarters and of the Defense Platoon moved south
to secure the bridge west of CHEF DU PONT (321930) where it encountered
severe enemy fire. This group returned to the Command Post at 1700, but
part of the Defense Platoon moved to a new Force "A" Command
Post at a railroad pass at 323960.
The Division Headquarters initial glider serial, which landed in the
dark
at approximately 0415 hours, was scattered, and the G-2 and G-3 did not
reach the
command post until late afternoon. The Chief of Staff was injured in a
glider
crash and later evacuated. The G-1 did not reach the command post for
two days.
505th Parachute Infantry Regiment
The first element, the 2d Battalion, dropped at 0151 hours and the entire
regiment landed by 0202 hours. Most of the troops landed on or near the
drop zone, but a few were widely dispersed over the countryside. Assembly
was rapid, and the battalions moved off towards their objectives. The
3d Battalion entered STE. MERE EGLISE at 0400 hours, and the town was
securely held and outposted within an hour. The American Flag was raised
over STE. MERE EGLISE, the first French town to be liberated by the Allies.
After assembling the 2d Battalion started to move out to take NEUVILLE
AU PLAIN, but orders were received from the regiment to stand by. At 0600
hours the 2d Battalion moved into position north of STE. MERE EGLISE and
assisted the 3d Battalion in holding the town. The 1st Battalion moved
Towards its objective, the bridge over the MERDERET River (314956) at
LA FIERE at 0630 hours and by 0830 held the eastern end of the bridge
against heavy enemy fire from the western approaches.
507th Parachute Infantry Regiment
The first elements, the 1st Battalion, jumped at 0232 hours, and by 0312
hours the entire regiment was on the ground generally east of the MERDERET
River and was fairly dispersed. Small groups assembled to form small task
forces until such time as the regiment could assemble completely. One
such force on the west bank of the MERDERET River attacked AMFREVILLE
but was forced back by overwhelming superiority in enemy strength to FLAUK
(303955). A patrol was sent to the western end of LA FIERE Bridge and
contact was made with elements of the 505th Parachute Infantry on the
eastern end at 1430 hours. The enemy recaptured FLAUK and drove this patrol
from the western end of the LA FIERE Bridge. Another force of the regiment
joined with Force "A" Headquarters and at 1130 attacked to secure
the CHEF DU PONT Bridge (321930), meeting extremely severe resistance.
The eastern end of the bridge was finally secured by nightfall. Leaving
one company to hold the bridge, the remainder of this second force moved
to an assembly area at 1715 hours in the vicinity of the railroad overpass
at 323960. Still another group, led by the regimental commander, landed
on or near the scheduled drop zone but had no contact with other elements
of the Division during the day.
508th Parachute Infantry Regiment
The 3d Battalion jumped at 0208 hours and the entire regiment was on the
ground by 0220 hours. Four separate groups were assembled. One group was
in the vicinity of LA FIERE, fought along the railway and attacked the
LA FIERE Bridge. This group was later relieved by the 1st Battalion, 505th
Parachute Infantry and moved to an assembly area in the vicinity of the
railroad overpass (323960) to organize a defensive position. Two other
groups joined forces west of the MERDERET River in the vicinity of PICAUVILLE
after taking part in heavy fighting around GUETTEVILLE (300948) and north
of PICAUVILLE. An officer of this group shot and killed the commanding
general of the German 91st Division. The combined group then seized the
high ground west of the MERDERET River south of GUETTEVILLE at 310940
during the night of June 6-7. A fourth group dropped in the vicinity of
STE. MERE EGLISE, fought with the 507th Parachute Infantry to take the
CHEF DU PONT Bridge (321930) and later organized a defensive position
covering the bridge.
325th Glider Infantry Regiment
Company F, 3d Battalion, supporting Company C, 746th Tank Battalion, landed
on Utah Red Beach at 1400, de-waterproofed vehicles and moved inland at
1600 to make contact with the Division. Heavy artillery, mortar and small
arms fire held up this task force at crossroads 363933. Two tanks were
knocked out. The remainder of the regiment prepared to take off from airports
in England.
82d Airborne Division Artillery
Parachute elements jumped at 0210 hours, joined a group from the 508th
Parachute Infantry and assisted in the attack on the LA FIERE Bridge.
At 1330 hours this element joined the glider element at the Division CP
at 332965. Glider elements landed at 0500 hours and moved directly to
the Division CP. At 2305 hours Headquarters and Headquarters Battery of
Division Artillery, the 319th Glider Field Artillery Battalion and the
320th Glider Field Artillery Battalion glided into NORMANDY and encountered
severe enemy small arms and mortar fire. Reorganization commenced immediately
but was handicapped by intense enemy fire. The section of the 456th Parachute
Field Artillery Battalion attached to 505th Parachute Infantry jumped
with the 3d Battalion, but was able to assemble only one of the two 75mm
pack howitzers which had been dropped.
80th Airborne Antiaircraft Battalion (AT)
Batteries A and B landed by glider at 0405 hours. Six 57mm antitank guns
had been recovered and were in position by 1750 hours. Battery C glided
into the area at 2100 hours and began assembly and reorganization. The
remainder of the Battalion sailed from BRISTOL, ENGLAND, at 0645 hours.
307th Airborne Engineer Battalion
Company B (less one platoon attached to the 505th Parachute Infantry)
jumped with the 508th Parachute Infantry at 0210 hours. Some Engineer
personnel took up defensive positions at LA FIERE in support of one group
of the 506th, and other personnel joined the 508th group west of the MERDERET
River. One "stick", which included the Battalion Commander,
was dropped over ST. SAUVEUR LE VICOMTE, and only a few escaped. Part
of Headquarters and Company A landed by glider at 2300 hours and started
to assemble under heavy enemy artillery and small arms fire. The reminder
of the battalion prepared to take off from airports in ENGLAND.
307th Airborne Medical Company
Elements of the company landed by glider about 2100 and immediately began
assembly, recovering by use of life rafts much equipment from gliders
that had landed in shallow water near the banks of the MERDERET River.
A clearing station was set up at a crossroad north of BLOSVILLE.
82d Airborne Signal Company
Parachute and glider elements of the company which landed prior to H-Hour
were scattered and assembled with difficulty. Much equipment was lost.
Only one of the three SCR 193 radios landed during D-Day was operative,
and it was not until the night of June 6-7 that radio contact was established
with the 4th Infantry Division and with the Division base in ENGLAND.
D PLUS 1, 7 JUNE 1944
The Division continued to assemble, reorganize, and seccure its area
against extremely severe enemy resistance which included armor. Enemy
troops, identified as the 91st Infantry Division, were held along the
MERDERET River to the west and were driven back to the north and northwest.
Contact was established with the 4th Infantry Division during the day,
and the VII Corps Commander visited the Division Command Post late in
the day. The 325th Glider Infantry arrived by glider during the morning.
Additional personnel which had been scattered in the original landings
continued to report back to their units.
During the afternoon garbled radio messages signed "CO 507"
were received at the Division Command Post, and it was finally determined
that they originated with the Regimental Commander who was isolated with
a group of about 300 men west of AMFREVILLE.
325th Glider Infantry Regiment
The first glider elements began landing at 0700 hours about 2,500 yards
southeast of STE. MERE EGLISE. They were many crash landings, and casualties
totalled approximately 7.5 per cent. Assembly was rapid, however, and
by 1015 hours all battalions were reported. The 3d Battalion moved out
toward CARQUEBUT at 1415 hours and reached LE PORT (328918) without encountering
opposition. The remainder of the regiment proceeded to move into an assembly
area northeast of CHEF DU PONT. At 1600 hours the 2d Battalion was ordered
to move into an assembly area east of LA FIERE in the vicinity of 325962
and later was attached to the 505th Parachute Infantry at 2100 hours.
The 1st and 3d Battalions were ordered to move into and to outpost the
regimental assembly area. Company F, 3d Battalion in support of Company
C, 746th Tank Battalion, and the 1st Platoon, Troop B, 4th Cavalry Reconnaissance
Squadron, assisted the 8th Infantry in its attack towards STE. MERE EGLISE
from the west at 0630 hours and made contact with gliderborne elements
of the 325th by 0900. The 325th's regimental strength at the close of
the day was approximately 85 per cent.
505th Parachute Infantry Regiment
The 2d and 3d Battalions continued to hold STE. MERE EGLISE against several
attacks from the north and south. The 2d Battalion patrols contacted elements
of the 8th Infantry Regiment of the 4th Infantry Division at STE. MARTINE
(384973) at 1000 hours and attacked north to clear the outskirts of STE.
MERE EGLISE. The 1st Battalion withstood several counterattacks and pushed
the enemy back to the eastern bank of the MERDERET River in the vicinity
of the LA FIERE Bridge. They were supported late in the day by one platoon
of tanks from Company C, 746th Tank Battalion. At the close of the period
the 2d and 3d Battalions prepared to attack north toward NEUVILLE AU PLAIN
in conjonction with the 4th Infantry Division's drive on the right. The
2d Battalion, 325th Glider Infantry, was attached at 2100 to assist in
this attack.
507th Parachute Infantry Regiment
The regiment moved into an area west of STE. MERE EGLISE in the vicinity
of 335960, rested and reorganized. At 1600 hours the regiment moved into
positions south of the LA FIERE - STE. MERE EGLISE Road west of the railroad
to assist the 1st Battalion, 505th Parachute Infantry, against a threatened
counterattack at the LA FIERE Bridge. AT 1900 hours the 507th, at approximately
25 per cent strength, successfully pushed the enemy back to the west bank
of the MERDERET River in its sector.
508th Parachute Infantry Regiment
One group near the railroad overpass (323960) moved into positions in
the vicinity of the road junction 334972 to protect the Division's north
flank against enemy penetration. This group was in position by 0630 hours,
but it later moved to join another group of the regiment in position defending
the CHEF DU PONT Bridge. It mopped up numerous enemy strong points surrounding
CHEF DU PONT and established patrol contact with elements of the regiment
west of the MERDERET River on the high ground in the vicinity of 310940.
The group on the high ground, now recognized as the 2d Battalion, had
completed organization of its position by 1300 hours, wiping out a number
of enemy mortar and artillery positions. A road block was set up on the
western approaches to the CHEF DU PONT Bridge and contact was established
with forces in CHEF DU PONT. Regimental strength at the close of the day
was approximately 25 per cent.
82d Airborne Division Artillery
Various groups of the artillery were involved in individual skirmishes
with the enemy as they found their way back to their parent units. The
319th Glider Field Artillery Battalion Assembled east of STE. MERE EGLISE
in the vicinity of 371974 with six 75mm pack howitzers. The 320th Glider
Field Artillery Battalion was placed in direct support of the 505th Parachute
Infantry. After salvaging two 105mm M3 howitzers and taking over the 75mm
pack howitzer of the 456th Parachute Field Artillery Battalion detachment
with the 505th, the 320th went into position 400 yards west of STE. MERE
EGLISE. The first round was fired at 0911 hours. The seaborne echelon
of the 456th Parachute Field Artillery Battalion arrived off Utah Beach
but did not land.
80th Airborne Antiaircraft Battalion
Batteries A, B, and C continued to reorganize and by 1800 hours six 57mm
antitank guns of Battery C and three guns each from Batteries A and B
were in position covering the two bridges over the MERDERET River. The
remainder of the Battalion remained on board ships preparing to disembark
on Utah Beach.
307th Airborne Engineer Battalion
The remainder of Company A landed by glider at 0700 hours and moved to
join the 325th Infantry in the vicinity of CHEF DU PONT at 0930hours.
Bridges and culverts south of LE PORT (328918) and near LIESVILLE (331905)
were blown.
Aerial Resupply
An aerial resupply mission, including 148 of the 248 C-47 planes which
had taken off, arrived over the area at 0620. They dropped 155.5 tons
of ordnance, quartermaster and medical supplies, 74% of the originally
scheduled load. The drop pattern was poor and bundles were scattered,
many of them falling into enemy hands or being covered by enemy fire.